All systems are operational
Scheduled Maintenance
Planned Maintenance - Transit Link Migration

Date/Time

  • Start: 13/10/25 23:00 BST
  • Finish: 14/10/25 02:00 BST

Actions

We will be conducting a maintenance activity in our UK network to migrate the BGP transit connectivity link for the Sonassi platform from a legacy core device to a newer device as part of a core network refresh.

Estimated Downtime

No downtime is expected, though during the maintenance period services will be considered "at risk" - we'll be monitoring the network closely throughout the period as a precaution.

Past Incidents

Wednesday 13th January 2016

No incidents reported

Tuesday 12th January 2016

No incidents reported

Monday 11th January 2016

No incidents reported

Sunday 10th January 2016

No incidents reported

Saturday 9th January 2016

No incidents reported

Friday 8th January 2016

Network Switch Failure

Our monitoring probes have reported an access switch failure.

  • Update (12:20): An engineer is on site investigating the cause.
  • Update (12:37): The onsite engineer has identified an issue, work is ongoing to rectify this. Estimated time to fix: 5 minutes
  • Update (12:43): The onsite engineer has rectified the problem and all affected servers are back online.

Thursday 7th January 2016

No incidents reported