Sunday 9th October 2011

Network Interface reboot required on sms-sagat

After bringing up switch a - sms-sagat has not behaved in the way as expected (still routing via switch b). As a result, the network interface will be reset. The downtime should be minimal.

Resolved

Services are back up and running now, apologies for the slight glitch and 1 minute downtime.