11/09/2026 10:00-16:00 As part of our commitment to quality and continual improvement, Iomart will be conducting a Black Building Test at our Manchester Data Centre (DC13) on 11 September 2026. This activity is required to verify the correct operation of our power backup systems and to carry out dynamic and functional testing of the switchgear breakers.
What Will Happen? The following checks and activities will be completed by the combined project team:
The work will be carried out on the 11th September 2026, between 1000 to 1600hrs, however, the expected duration of this activity is approximately 6 hours.
Our specialist contractors Vertiv and Vital, and Sudlows will also be supporting this activity alongside our DC Operations Engineers
Disruption As with any maintenance activity, there is a degree of risk; however, the Black Building Test is expected to be non-service affecting. Should the risk to site operations increase at any stage during the test, the activity will be immediately aborted, and mains power will be reinstated.