Date/Time
Start Date / Time: 23/11/16 16:00
Finish Date / Time: 23/11/16 18:00
Disruption
Access switch replacement, internal network capacity increase.
Estimated Downtime
Up to 15 minutes
Actions
We will be upgrading each access switches within each affected rack. The procedure will include failing traffic over to the backup switch, replacing the primary switch, restoring normal traffic flows, then replacing the backup switch. Downtime should be kept to an absolute minimum through this process unless an unplanned incident occurs.